These are the top 10 ports that CNC Line services. They are ranked by frequency of departures and include both international and domestic services.
CNC Line
ChengLie Navigation Co
CNC Line is a Shipping Line that provides Ocean based transport and runs regular services to countries such as China, Malaysia, South Korea, Singapore and Taiwan. The SCAC code for CNC Line is 11DX.

- Website
- cncline.com.tw
CNC Line schedules
Upcoming vessel departures and sailing schedules for ChengLie Navigation Co
Next Departure | Arriving in | Duration | Vessel | Description 27 Mar 28 Mar 30 Mar 31 Mar 2 Apr | |
---|---|---|---|---|---|
1 day 19h Direct service | HE LE IMO 9412866 | ||||
10hrs Direct service | CNC SULAWESI IMO 9963736 | ||||
4 days 14h Direct service | CMA CGM LISBON IMO 9431800 | ||||
2 days 23h Direct service | CNC LION IMO 9784661 | ||||
5 days 1h Direct service | CNC PANTHER IMO 9945344 |
Top 10 ports serviced by this carrier
Rank | Port Code | Port Name | Country | Departure frequency | |
---|---|---|---|---|---|
1 | CNSHG | Shanghai | China | Every 1-2 days | More details |
2 | MYPKG | Port Klang | Malaysia | Every 1-2 days | More details |
3 | KRPUS | Busan | South Korea | Every 1-2 days | More details |
4 | CNSHK | Shekou | China | Every 1-2 days | More details |
5 | SGSIN | Singapore | Singapore | Every 1-2 days | More details |
6 | TWKHH | Kaohsiung | Taiwan | Every 1-2 days | More details |
7 | THLCH | Laem Chabang | Thailand | Every 1-2 days | More details |
8 | CNNGB | Ningbo | China | 2-4 times a week | More details |
9 | CNNSA | Nansha | China | 2-4 times a week | More details |
10 | HKHKG | Hong Kong | Hong Kong | 2-4 times a week | More details |
Carrier statistics
#15Global Rank
CNC Line is ranked 15th in the world against other carriers when comparing service frequency and global port coverage.
On time performance
This chart displays the On Time Arrival performance for CNC Line as measured by comparing all vessel scheduled vessel arrivals vs actual arrivals.
Feb OTP 31.18%
Previous month OTP 36.67%
Average days late
A vessel is considered late when arriving more than 1 day behind schedule. This chart shows the average number of days that CNC Line vessels are typically late by.
Feb 2.3 days
Previous month 1.9 days