These are the top 10 ports that PIL services. They are ranked by frequency of departures and include both international and domestic services.
PIL
Pacific International Lines
PIL is a Shipping Line that provides Ocean based transport and runs regular services to countries such as Singapore, China, Malaysia, Vietnam and India. The SCAC code for PIL is PCIU.

PIL schedules
Upcoming vessel departures and sailing schedules for Pacific International Lines
| Next Departure | Arriving in | Duration | Vessel | Description 3 Oct 6 Oct 10 Oct 13 Oct 16 Oct | |
|---|---|---|---|---|---|
8 days 13h Direct service | SELATAN DAMAI IMO 9353931 | ||||
1 day 10h Direct service | KOTA PRIMROSE IMO 9475674 | ||||
10 days 3h Direct service | KOTA LUMAYAN IMO 9494541 | ||||
22h 38m Direct service | KOTA ELOK IMO 1081831 | ||||
24h 43m Direct service | MANET IMO 9224958 |
Top 10 ports serviced by this carrier
| Rank | Port Code | Port Name | Country | Departure frequency | |
|---|---|---|---|---|---|
| 1 | SGSIN | Singapore | Singapore | 2-4 times a day | More details |
| 2 | CNNGB | Ningbo | China | Daily | More details |
| 3 | CNSHG | Shanghai | China | Every 1-2 days | More details |
| 4 | CNNSA | Nansha | China | Every 1-2 days | More details |
| 5 | MYPKG | Port Klang | Malaysia | Every 1-2 days | More details |
| 6 | CNQDG | Qingdao | China | 2-4 times a week | More details |
| 7 | CNSHK | Shekou | China | 2-4 times a week | More details |
| 8 | VNHPH | Haiphong | Vietnam | 2-4 times a week | More details |
| 9 | INCCU | Kolkata | India | 2-4 times a week | More details |
| 10 | DJJIB | Djibouti | Djibouti | 2-4 times a week | More details |
Carrier statistics
#17Global Rank
PIL is ranked 17th in the world against other carriers when comparing service frequency and global port coverage.
On time performance
This chart displays the On Time Arrival performance for PIL as measured by comparing all vessel scheduled vessel arrivals vs actual arrivals.
Jul OTP 13.80%
Previous month OTP 19.58%
Average days late
A vessel is considered late when arriving more than 1 day behind schedule. This chart shows the average number of days that PIL vessels are typically late by.
Jul 5.8 days
Previous month 5.5 days