These are the top 10 ports that PIL services. They are ranked by frequency of departures and include both international and domestic services.
PIL
Pacific International Lines
PIL is a Shipping Line that provides Ocean based transport and runs regular services to countries such as Singapore, China, Malaysia, Vietnam and India. The SCAC code for PIL is PCIU.

PIL schedules
Upcoming vessel departures and sailing schedules for Pacific International Lines
| Next Departure | Arriving in | Duration | Vessel | Description 10 Sep 13 Sep 15 Sep 17 Sep 19 Sep | |
|---|---|---|---|---|---|
1 day 14h Direct service | SINAR PANGANDARAN IMO 1033779 | ||||
3 days 18h Direct service | KOTA DUTA IMO 9483487 | ||||
8 days 7h Direct service | KOTA NASRAT IMO 9494620 | ||||
1 day 1h Direct service | KOTA LEMBAH IMO 9622318 | ||||
2 days 10h Direct service | KOTA RUKUN IMO 9167459 |
Top 10 ports serviced by this carrier
| Rank | Port Code | Port Name | Country | Departure frequency | |
|---|---|---|---|---|---|
| 1 | SGSIN | Singapore | Singapore | 2-4 times a day | More details |
| 2 | CNNGB | Ningbo | China | Daily | More details |
| 3 | CNSHG | Shanghai | China | Every 1-2 days | More details |
| 4 | CNNSA | Nansha | China | Every 1-2 days | More details |
| 5 | MYPKG | Port Klang | Malaysia | Every 1-2 days | More details |
| 6 | CNQDG | Qingdao | China | 2-4 times a week | More details |
| 7 | CNSHK | Shekou | China | 2-4 times a week | More details |
| 8 | VNHPH | Haiphong | Vietnam | 2-4 times a week | More details |
| 9 | INCCU | Kolkata | India | 2-4 times a week | More details |
| 10 | DJJIB | Djibouti | Djibouti | 2-4 times a week | More details |
Carrier statistics
#17Global Rank
PIL is ranked 17th in the world against other carriers when comparing service frequency and global port coverage.
On time performance
This chart displays the On Time Arrival performance for PIL as measured by comparing all vessel scheduled vessel arrivals vs actual arrivals.
Jul OTP 13.80%
Previous month OTP 19.58%
Average days late
A vessel is considered late when arriving more than 1 day behind schedule. This chart shows the average number of days that PIL vessels are typically late by.
Jul 5.8 days
Previous month 5.5 days